{"id":26783,"date":"2020-02-13T08:55:14","date_gmt":"2020-02-13T13:55:14","guid":{"rendered":"https:\/\/ebw.tv\/?p=26783"},"modified":"2020-02-13T08:55:21","modified_gmt":"2020-02-13T13:55:21","slug":"construction-begins-for-petroleum-line-under-st-clair-river","status":"publish","type":"post","link":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/","title":{"rendered":"Construction Begins for Petroleum Line Under St Clair River"},"content":{"rendered":"\n<p>Construction is now underway by Enbridge for the drilling and placement of a new petroleum pipeline underneath the St. Clair River. According to Enbridge, the preliminary work on the line replacement is happening now, with drilling planned to start March 1, weather permitting. Construction is expected to take four months. Due to the ongoing construction, there will be significant noise with the Horizontal Directional Drill, but noise mitigation structures are planned. The St. Clair River line is part of \u201cLine 5\u201d and goes between Marysville and Froomfield, Ontario. The line will carry petroleum products from western Ontario to Eastern Ontario. It is the same line that is under the Mackinaw Bridge and has been the object of years of litigation and environmental protest. The new St. Clair River section of the pipeline is expected to be around 30 feet below the river. The current pipeline is four feet under the river. The 645-mile-long Line 5 will carry about 22.6 million gallons per day, and according to Michigan Oil and Gas Association, it provides much of the petroleum products needed to heat and run homes and businesses throughout Michigan. Michigan\u2019s Attorney General has tried to shut down Line 5 citing it as an unacceptable environmental risk to the Great Lakes, but the Line 5 agreement has been upheld by courts and regulatory agencies in both the United States and Canada.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction is now underway by Enbridge for the drilling and placement of a new petroleum pipeline underneath the St. Clair River. According to Enbridge, the preliminary work on the line replacement is happening now, with drilling planned to start March 1, weather permitting. Construction is expected to take four months. Due to the ongoing construction, [&hellip;]<\/p>\n","protected":false},"author":46,"featured_media":26789,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_uag_custom_page_level_css":"","footnotes":""},"categories":[1968,24],"tags":[236,4275,1889,2240,4276,181],"class_list":["post-26783","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-current","category-daily-news","tag-construction","tag-enbridge","tag-line-5","tag-nature","tag-petroleum","tag-st-clair-river","et_post_format-et-post-format-video","et-has-post-format-content"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Begins for Petroleum Line Under St Clair River - Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Begins for Petroleum Line Under St Clair River\" \/>\n<meta property=\"og:description\" content=\"According to Enbridge, the preliminary work on the line replacement is happening now, with drilling planned to start March 1, weather permitting. Construction is expected to take four months.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/\" \/>\n<meta property=\"og:site_name\" content=\"Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bluewatertv\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-02-13T13:55:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-02-13T13:55:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Marysville Tire &amp; Auto\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Construction Begins for Petroleum Line Under St Clair River\" \/>\n<meta name=\"twitter:description\" content=\"According to Enbridge, the preliminary work on the line replacement is happening now, with drilling planned to start March 1, weather permitting. Construction is expected to take four months.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png\" \/>\n<meta name=\"twitter:creator\" content=\"@EbwtvNews\" \/>\n<meta name=\"twitter:site\" content=\"@EbwtvNews\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Marysville Tire &amp; Auto\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/\"},\"author\":{\"name\":\"Marysville Tire &amp; Auto\",\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/person\/17f49d93c8e3efa82006b655175a41c5\"},\"headline\":\"Construction Begins for Petroleum Line Under St Clair River\",\"datePublished\":\"2020-02-13T13:55:14+00:00\",\"dateModified\":\"2020-02-13T13:55:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/\"},\"wordCount\":232,\"publisher\":{\"@id\":\"https:\/\/thumbcoast.tv\/#organization\"},\"image\":{\"@id\":\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png\",\"keywords\":[\"Construction\",\"Enbridge\",\"line 5\",\"Nature\",\"Petroleum\",\"st. clair river\"],\"articleSection\":[\"Current\",\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/\",\"url\":\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/\",\"name\":\"Construction Begins for Petroleum Line Under St Clair River - Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast\",\"isPartOf\":{\"@id\":\"https:\/\/thumbcoast.tv\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png\",\"datePublished\":\"2020-02-13T13:55:14+00:00\",\"dateModified\":\"2020-02-13T13:55:21+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#primaryimage\",\"url\":\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png\",\"contentUrl\":\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png\",\"width\":1200,\"height\":600},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/thumbcoast.tv\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction Begins for Petroleum Line Under St Clair River\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/thumbcoast.tv\/#website\",\"url\":\"https:\/\/thumbcoast.tv\/\",\"name\":\"ebw.tv - Everything Blue Water Television Network\",\"description\":\"The Blue Water Area&#039;s Positive News Network!\",\"publisher\":{\"@id\":\"https:\/\/thumbcoast.tv\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/thumbcoast.tv\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/thumbcoast.tv\/#organization\",\"name\":\"Blue Water Television Network\",\"url\":\"https:\/\/thumbcoast.tv\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/secureservercdn.net\/198.71.233.36\/999.6a1.myftpupload.com\/wp-content\/uploads\/2017\/04\/cropped-ebw-blue.png?time=1625864790\",\"contentUrl\":\"https:\/\/secureservercdn.net\/198.71.233.36\/999.6a1.myftpupload.com\/wp-content\/uploads\/2017\/04\/cropped-ebw-blue.png?time=1625864790\",\"width\":512,\"height\":512,\"caption\":\"Blue Water Television Network\"},\"image\":{\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bluewatertv\/\",\"https:\/\/x.com\/EbwtvNews\",\"https:\/\/www.instagram.com\/ebw.tv\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/person\/17f49d93c8e3efa82006b655175a41c5\",\"name\":\"Marysville Tire &amp; Auto\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6211d2a49c406557cccaaeecb5eb0db604bdb30496388fbe5fbdfcc5fcfd82ee?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/6211d2a49c406557cccaaeecb5eb0db604bdb30496388fbe5fbdfcc5fcfd82ee?s=96&d=mm&r=g\",\"caption\":\"Marysville Tire &amp; Auto\"},\"url\":\"https:\/\/thumbcoast.tv\/author\/marysville-tire-and-auto\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Begins for Petroleum Line Under St Clair River - Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/","og_locale":"en_US","og_type":"article","og_title":"Construction Begins for Petroleum Line Under St Clair River","og_description":"According to Enbridge, the preliminary work on the line replacement is happening now, with drilling planned to start March 1, weather permitting. Construction is expected to take four months.","og_url":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/","og_site_name":"Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast","article_publisher":"https:\/\/www.facebook.com\/bluewatertv\/","article_published_time":"2020-02-13T13:55:14+00:00","article_modified_time":"2020-02-13T13:55:21+00:00","og_image":[{"width":1200,"height":600,"url":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png","type":"image\/png"}],"author":"Marysville Tire &amp; Auto","twitter_card":"summary_large_image","twitter_title":"Construction Begins for Petroleum Line Under St Clair River","twitter_description":"According to Enbridge, the preliminary work on the line replacement is happening now, with drilling planned to start March 1, weather permitting. Construction is expected to take four months.","twitter_image":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png","twitter_creator":"@EbwtvNews","twitter_site":"@EbwtvNews","twitter_misc":{"Written by":"Marysville Tire &amp; Auto","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#article","isPartOf":{"@id":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/"},"author":{"name":"Marysville Tire &amp; Auto","@id":"https:\/\/thumbcoast.tv\/#\/schema\/person\/17f49d93c8e3efa82006b655175a41c5"},"headline":"Construction Begins for Petroleum Line Under St Clair River","datePublished":"2020-02-13T13:55:14+00:00","dateModified":"2020-02-13T13:55:21+00:00","mainEntityOfPage":{"@id":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/"},"wordCount":232,"publisher":{"@id":"https:\/\/thumbcoast.tv\/#organization"},"image":{"@id":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#primaryimage"},"thumbnailUrl":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png","keywords":["Construction","Enbridge","line 5","Nature","Petroleum","st. clair river"],"articleSection":["Current","News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/","url":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/","name":"Construction Begins for Petroleum Line Under St Clair River - Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast","isPartOf":{"@id":"https:\/\/thumbcoast.tv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#primaryimage"},"image":{"@id":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#primaryimage"},"thumbnailUrl":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png","datePublished":"2020-02-13T13:55:14+00:00","dateModified":"2020-02-13T13:55:21+00:00","breadcrumb":{"@id":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#primaryimage","url":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png","contentUrl":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png","width":1200,"height":600},{"@type":"BreadcrumbList","@id":"https:\/\/thumbcoast.tv\/construction-begins-for-petroleum-line-under-st-clair-river\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/thumbcoast.tv\/"},{"@type":"ListItem","position":2,"name":"Construction Begins for Petroleum Line Under St Clair River"}]},{"@type":"WebSite","@id":"https:\/\/thumbcoast.tv\/#website","url":"https:\/\/thumbcoast.tv\/","name":"ebw.tv - Everything Blue Water Television Network","description":"The Blue Water Area&#039;s Positive News Network!","publisher":{"@id":"https:\/\/thumbcoast.tv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/thumbcoast.tv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/thumbcoast.tv\/#organization","name":"Blue Water Television Network","url":"https:\/\/thumbcoast.tv\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thumbcoast.tv\/#\/schema\/logo\/image\/","url":"https:\/\/secureservercdn.net\/198.71.233.36\/999.6a1.myftpupload.com\/wp-content\/uploads\/2017\/04\/cropped-ebw-blue.png?time=1625864790","contentUrl":"https:\/\/secureservercdn.net\/198.71.233.36\/999.6a1.myftpupload.com\/wp-content\/uploads\/2017\/04\/cropped-ebw-blue.png?time=1625864790","width":512,"height":512,"caption":"Blue Water Television Network"},"image":{"@id":"https:\/\/thumbcoast.tv\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bluewatertv\/","https:\/\/x.com\/EbwtvNews","https:\/\/www.instagram.com\/ebw.tv\/"]},{"@type":"Person","@id":"https:\/\/thumbcoast.tv\/#\/schema\/person\/17f49d93c8e3efa82006b655175a41c5","name":"Marysville Tire &amp; Auto","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thumbcoast.tv\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/6211d2a49c406557cccaaeecb5eb0db604bdb30496388fbe5fbdfcc5fcfd82ee?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6211d2a49c406557cccaaeecb5eb0db604bdb30496388fbe5fbdfcc5fcfd82ee?s=96&d=mm&r=g","caption":"Marysville Tire &amp; Auto"},"url":"https:\/\/thumbcoast.tv\/author\/marysville-tire-and-auto\/"}]}},"uagb_featured_image_src":{"full":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png",1200,600,false],"thumbnail":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-150x150.png",150,150,true],"medium":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-300x150.png",300,150,true],"medium_large":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-768x384.png",768,384,true],"large":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-1024x512.png",1024,512,true],"feed_thumbnail":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-150x75.png",150,75,true],"feed_thumbnail@2x":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-300x150.png",300,150,true],"1536x1536":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png",1200,600,false],"2048x2048":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png",1200,600,false],"et-builder-post-main-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-400x250.png",400,250,true],"et-builder-post-main-image-fullwidth":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-1080x600.png",1080,600,true],"et-builder-portfolio-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-400x284.png",400,284,true],"et-builder-portfolio-image-single":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-1080x540.png",1080,540,true],"et-builder-gallery-image-portrait":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-400x516.png",400,516,true],"extra-image-huge":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png",1200,600,false],"extra-image-single-post":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png",1200,600,false],"extra-image-medium":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-627x376.png",627,376,true],"extra-image-small":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-440x264.png",440,264,true],"extra-image-square-medium":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-440x440.png",440,440,true],"extra-image-square-small":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1-150x150.png",150,150,true],"et-pb-post-main-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png",400,200,false],"et-pb-post-main-image-fullwidth":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png",1080,540,false],"et-pb-portfolio-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png",400,200,false],"et-pb-portfolio-module-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png",510,255,false],"et-pb-portfolio-image-single":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png",1080,540,false],"et-pb-gallery-module-image-portrait":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png",400,200,false],"slider_image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2020\/02\/Line-5-1.png",1,1,false]},"uagb_author_info":{"display_name":"Marysville Tire &amp; Auto","author_link":"https:\/\/thumbcoast.tv\/author\/marysville-tire-and-auto\/"},"uagb_comment_info":0,"uagb_excerpt":"Construction is now underway by Enbridge for the drilling and placement of a new petroleum pipeline underneath the St. Clair River. According to Enbridge, the preliminary work on the line replacement is happening now, with drilling planned to start March 1, weather permitting. Construction is expected to take four months. Due to the ongoing construction,&hellip;","_links":{"self":[{"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/posts\/26783","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/users\/46"}],"replies":[{"embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/comments?post=26783"}],"version-history":[{"count":1,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/posts\/26783\/revisions"}],"predecessor-version":[{"id":26795,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/posts\/26783\/revisions\/26795"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/media\/26789"}],"wp:attachment":[{"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/media?parent=26783"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/categories?post=26783"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/tags?post=26783"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}