{"id":25306,"date":"2019-12-17T08:58:18","date_gmt":"2019-12-17T13:58:18","guid":{"rendered":"https:\/\/ebw.tv\/?p=25306"},"modified":"2019-12-17T08:58:25","modified_gmt":"2019-12-17T13:58:25","slug":"harsens-island-dock-repairs-brings-ferry-back-into-operation","status":"publish","type":"post","link":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/","title":{"rendered":"Harsens Island Dock Repairs Brings Ferry Back Into Operation"},"content":{"rendered":"\n<p>The Harsens Island mainland ferry dock collapsed into the river last week causing chaos for some local residents and leaving many vehicles stranded on the downriver island. The good news, although longer than originally expected, is that the ferry is back to a normal operating schedule as of 6 p.m. Monday evening. While heavy trucks are still on hold, cars and light trucks can now cross with garbage pickup also resuming on the island this coming Friday. The dock collapse came about a month after the ferry owners submitted a repair plan to the Michigan State Police citing the summer\u2019s high water levels as the reason for the need to limit the types and weights of vehicles. The downstream, mainland dock had already been temporarily taken out of service to begin repairs that included new pipes for stabilization and a hinge foundation. The project was supposed to be completed in late spring, but the recent collapse will likely change that timeline. A passenger boat has been operating through Clay Township for individual passengers in the time since the incident. Champion\u2019s Auto Ferry, a privately owned business, owns and operates the sole ferry service to and from Harsens Island.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Harsens Island mainland ferry dock collapsed into the river last week causing chaos for some local residents and leaving many vehicles stranded on the downriver island. The good news, although longer than originally expected, is that the ferry is back to a normal operating schedule as of 6 p.m. Monday evening. While heavy trucks [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":25299,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_uag_custom_page_level_css":"","footnotes":""},"categories":[1968,24],"tags":[184,3721,3722,1493,594],"class_list":["post-25306","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-current","category-daily-news","tag-boat","tag-dock","tag-ferry","tag-harsens-island","tag-transportation","et_post_format-et-post-format-video","et-has-post-format-content"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Harsens Island Dock Repairs Brings Ferry Back Into Operation - Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Harsens Island Dock Repairs Brings Ferry Back Into Operation\" \/>\n<meta property=\"og:description\" content=\"The good news, although longer than originally expected, is that the ferry is back to a normal operating schedule as of 6 p.m. Monday evening. While heavy trucks are still on hold, cars and light trucks can now cross with garbage pickup also resuming on the island this coming Friday.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/\" \/>\n<meta property=\"og:site_name\" content=\"Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bluewatertv\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-12-17T13:58:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-12-17T13:58:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SEMCO Energy Gas Company\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Harsens Island Dock Repairs Brings Ferry Back Into Operation\" \/>\n<meta name=\"twitter:description\" content=\"The good news, although longer than originally expected, is that the ferry is back to a normal operating schedule as of 6 p.m. Monday evening. While heavy trucks are still on hold, cars and light trucks can now cross with garbage pickup also resuming on the island this coming Friday.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png\" \/>\n<meta name=\"twitter:creator\" content=\"@EbwtvNews\" \/>\n<meta name=\"twitter:site\" content=\"@EbwtvNews\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SEMCO Energy Gas Company\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/\"},\"author\":{\"name\":\"SEMCO Energy Gas Company\",\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/person\/bf2d8eba300ad4f294cc9bec6de8f259\"},\"headline\":\"Harsens Island Dock Repairs Brings Ferry Back Into Operation\",\"datePublished\":\"2019-12-17T13:58:18+00:00\",\"dateModified\":\"2019-12-17T13:58:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/\"},\"wordCount\":209,\"publisher\":{\"@id\":\"https:\/\/thumbcoast.tv\/#organization\"},\"image\":{\"@id\":\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png\",\"keywords\":[\"boat\",\"Dock\",\"Ferry\",\"harsens island\",\"transportation\"],\"articleSection\":[\"Current\",\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/\",\"url\":\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/\",\"name\":\"Harsens Island Dock Repairs Brings Ferry Back Into Operation - Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast\",\"isPartOf\":{\"@id\":\"https:\/\/thumbcoast.tv\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png\",\"datePublished\":\"2019-12-17T13:58:18+00:00\",\"dateModified\":\"2019-12-17T13:58:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#primaryimage\",\"url\":\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png\",\"contentUrl\":\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png\",\"width\":1200,\"height\":600},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/thumbcoast.tv\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Harsens Island Dock Repairs Brings Ferry Back Into Operation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/thumbcoast.tv\/#website\",\"url\":\"https:\/\/thumbcoast.tv\/\",\"name\":\"ebw.tv - Everything Blue Water Television Network\",\"description\":\"The Blue Water Area&#039;s Positive News Network!\",\"publisher\":{\"@id\":\"https:\/\/thumbcoast.tv\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/thumbcoast.tv\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/thumbcoast.tv\/#organization\",\"name\":\"Blue Water Television Network\",\"url\":\"https:\/\/thumbcoast.tv\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/secureservercdn.net\/198.71.233.36\/999.6a1.myftpupload.com\/wp-content\/uploads\/2017\/04\/cropped-ebw-blue.png?time=1625864790\",\"contentUrl\":\"https:\/\/secureservercdn.net\/198.71.233.36\/999.6a1.myftpupload.com\/wp-content\/uploads\/2017\/04\/cropped-ebw-blue.png?time=1625864790\",\"width\":512,\"height\":512,\"caption\":\"Blue Water Television Network\"},\"image\":{\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bluewatertv\/\",\"https:\/\/x.com\/EbwtvNews\",\"https:\/\/www.instagram.com\/ebw.tv\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/person\/bf2d8eba300ad4f294cc9bec6de8f259\",\"name\":\"SEMCO Energy Gas Company\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/cf4b4b020de3b4f8ff2688a4aa0300c016084c9486bd89b18e44760cb846b42b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/cf4b4b020de3b4f8ff2688a4aa0300c016084c9486bd89b18e44760cb846b42b?s=96&d=mm&r=g\",\"caption\":\"SEMCO Energy Gas Company\"},\"url\":\"https:\/\/thumbcoast.tv\/author\/semco-ad\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Harsens Island Dock Repairs Brings Ferry Back Into Operation - Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/","og_locale":"en_US","og_type":"article","og_title":"Harsens Island Dock Repairs Brings Ferry Back Into Operation","og_description":"The good news, although longer than originally expected, is that the ferry is back to a normal operating schedule as of 6 p.m. Monday evening. While heavy trucks are still on hold, cars and light trucks can now cross with garbage pickup also resuming on the island this coming Friday.","og_url":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/","og_site_name":"Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast","article_publisher":"https:\/\/www.facebook.com\/bluewatertv\/","article_published_time":"2019-12-17T13:58:18+00:00","article_modified_time":"2019-12-17T13:58:25+00:00","og_image":[{"width":1200,"height":600,"url":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png","type":"image\/png"}],"author":"SEMCO Energy Gas Company","twitter_card":"summary_large_image","twitter_title":"Harsens Island Dock Repairs Brings Ferry Back Into Operation","twitter_description":"The good news, although longer than originally expected, is that the ferry is back to a normal operating schedule as of 6 p.m. Monday evening. While heavy trucks are still on hold, cars and light trucks can now cross with garbage pickup also resuming on the island this coming Friday.","twitter_image":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png","twitter_creator":"@EbwtvNews","twitter_site":"@EbwtvNews","twitter_misc":{"Written by":"SEMCO Energy Gas Company","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#article","isPartOf":{"@id":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/"},"author":{"name":"SEMCO Energy Gas Company","@id":"https:\/\/thumbcoast.tv\/#\/schema\/person\/bf2d8eba300ad4f294cc9bec6de8f259"},"headline":"Harsens Island Dock Repairs Brings Ferry Back Into Operation","datePublished":"2019-12-17T13:58:18+00:00","dateModified":"2019-12-17T13:58:25+00:00","mainEntityOfPage":{"@id":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/"},"wordCount":209,"publisher":{"@id":"https:\/\/thumbcoast.tv\/#organization"},"image":{"@id":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#primaryimage"},"thumbnailUrl":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png","keywords":["boat","Dock","Ferry","harsens island","transportation"],"articleSection":["Current","News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/","url":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/","name":"Harsens Island Dock Repairs Brings Ferry Back Into Operation - Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast","isPartOf":{"@id":"https:\/\/thumbcoast.tv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#primaryimage"},"image":{"@id":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#primaryimage"},"thumbnailUrl":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png","datePublished":"2019-12-17T13:58:18+00:00","dateModified":"2019-12-17T13:58:25+00:00","breadcrumb":{"@id":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#primaryimage","url":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png","contentUrl":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png","width":1200,"height":600},{"@type":"BreadcrumbList","@id":"https:\/\/thumbcoast.tv\/harsens-island-dock-repairs-brings-ferry-back-into-operation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/thumbcoast.tv\/"},{"@type":"ListItem","position":2,"name":"Harsens Island Dock Repairs Brings Ferry Back Into Operation"}]},{"@type":"WebSite","@id":"https:\/\/thumbcoast.tv\/#website","url":"https:\/\/thumbcoast.tv\/","name":"ebw.tv - Everything Blue Water Television Network","description":"The Blue Water Area&#039;s Positive News Network!","publisher":{"@id":"https:\/\/thumbcoast.tv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/thumbcoast.tv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/thumbcoast.tv\/#organization","name":"Blue Water Television Network","url":"https:\/\/thumbcoast.tv\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thumbcoast.tv\/#\/schema\/logo\/image\/","url":"https:\/\/secureservercdn.net\/198.71.233.36\/999.6a1.myftpupload.com\/wp-content\/uploads\/2017\/04\/cropped-ebw-blue.png?time=1625864790","contentUrl":"https:\/\/secureservercdn.net\/198.71.233.36\/999.6a1.myftpupload.com\/wp-content\/uploads\/2017\/04\/cropped-ebw-blue.png?time=1625864790","width":512,"height":512,"caption":"Blue Water Television Network"},"image":{"@id":"https:\/\/thumbcoast.tv\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bluewatertv\/","https:\/\/x.com\/EbwtvNews","https:\/\/www.instagram.com\/ebw.tv\/"]},{"@type":"Person","@id":"https:\/\/thumbcoast.tv\/#\/schema\/person\/bf2d8eba300ad4f294cc9bec6de8f259","name":"SEMCO Energy Gas Company","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thumbcoast.tv\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/cf4b4b020de3b4f8ff2688a4aa0300c016084c9486bd89b18e44760cb846b42b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/cf4b4b020de3b4f8ff2688a4aa0300c016084c9486bd89b18e44760cb846b42b?s=96&d=mm&r=g","caption":"SEMCO Energy Gas Company"},"url":"https:\/\/thumbcoast.tv\/author\/semco-ad\/"}]}},"uagb_featured_image_src":{"full":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png",1200,600,false],"thumbnail":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-150x150.png",150,150,true],"medium":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-300x150.png",300,150,true],"medium_large":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-768x384.png",768,384,true],"large":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-1024x512.png",1024,512,true],"feed_thumbnail":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-150x75.png",150,75,true],"feed_thumbnail@2x":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-300x150.png",300,150,true],"1536x1536":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png",1200,600,false],"2048x2048":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png",1200,600,false],"et-builder-post-main-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-400x250.png",400,250,true],"et-builder-post-main-image-fullwidth":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-1080x600.png",1080,600,true],"et-builder-portfolio-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-400x284.png",400,284,true],"et-builder-portfolio-image-single":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-1080x540.png",1080,540,true],"et-builder-gallery-image-portrait":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-400x516.png",400,516,true],"extra-image-huge":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png",1200,600,false],"extra-image-single-post":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png",1200,600,false],"extra-image-medium":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-627x376.png",627,376,true],"extra-image-small":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-440x264.png",440,264,true],"extra-image-square-medium":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-440x440.png",440,440,true],"extra-image-square-small":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island-150x150.png",150,150,true],"et-pb-post-main-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png",400,200,false],"et-pb-post-main-image-fullwidth":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png",1080,540,false],"et-pb-portfolio-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png",400,200,false],"et-pb-portfolio-module-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png",510,255,false],"et-pb-portfolio-image-single":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png",1080,540,false],"et-pb-gallery-module-image-portrait":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png",400,200,false],"slider_image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2019\/12\/Harsens-Island.png",1,1,false]},"uagb_author_info":{"display_name":"SEMCO Energy Gas Company","author_link":"https:\/\/thumbcoast.tv\/author\/semco-ad\/"},"uagb_comment_info":0,"uagb_excerpt":"The Harsens Island mainland ferry dock collapsed into the river last week causing chaos for some local residents and leaving many vehicles stranded on the downriver island. The good news, although longer than originally expected, is that the ferry is back to a normal operating schedule as of 6 p.m. Monday evening. While heavy trucks&hellip;","_links":{"self":[{"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/posts\/25306","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/comments?post=25306"}],"version-history":[{"count":1,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/posts\/25306\/revisions"}],"predecessor-version":[{"id":25309,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/posts\/25306\/revisions\/25309"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/media\/25299"}],"wp:attachment":[{"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/media?parent=25306"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/categories?post=25306"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/tags?post=25306"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}