{"id":10584,"date":"2018-06-15T10:11:57","date_gmt":"2018-06-15T14:11:57","guid":{"rendered":"https:\/\/ebw.tv\/?p=10584"},"modified":"2018-06-27T16:14:43","modified_gmt":"2018-06-27T20:14:43","slug":"indian-trail-begins-june-18-2018","status":"publish","type":"post","link":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/","title":{"rendered":"Construction on Indian Trail begins June 18th"},"content":{"rendered":"<p><a href=\"http:\/\/murphyinn.com\"><span style=\"color: #000080;\"><em>Sponsored by: Murphy Inn\u00a0<\/em><\/span><\/a><\/p>\n<p>Maintenance to waterproof the existing bridge on Indian Trail over Belle River is scheduled to begin on Monday, June 18 and end Thursday, June 21st.\u00a0 Work will include shot blasting the concrete surface of the bridge and an epoxy overlay for waterproofing. The posted detour for Indian Trail will be Puttygut Road, King Road, and Meisner Road. Access will be maintained to local traffic within the construction and closure zone, including homes and businesses, during the closure. The project is being financed by the St. Clair County Road Commission at an estimated cost for construction of $55,000.00.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sponsored by: Murphy Inn\u00a0 Maintenance to waterproof the existing bridge on Indian Trail over Belle River is scheduled to begin on Monday, June 18 and end Thursday, June 21st.\u00a0 Work will include shot blasting the concrete surface of the bridge and an epoxy overlay for waterproofing. The posted detour for Indian Trail will be Puttygut [&hellip;]<\/p>\n","protected":false},"author":53,"featured_media":10585,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_uag_custom_page_level_css":"","footnotes":""},"categories":[24],"tags":[],"class_list":["post-10584","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daily-news","et_post_format-et-post-format-video","et-has-post-format-content"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction on Indian Trail on Belle River begins June 18th<\/title>\n<meta name=\"description\" content=\"Maintenance to waterproof the existing bridge on Indian Trail over Belle River is scheduled to begin on Monday, June 18 and end Thursday, June 21st.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction on Indian Trail begins June 18th\" \/>\n<meta property=\"og:description\" content=\"Maintenance to waterproof the existing bridge on Indian Trail over Belle River is scheduled to begin on Monday, June 18 and end Thursday, June 21st. Work will include shot blasting the concrete surface of the bridge and an epoxy overlay for waterproofing. The posted detour for Indian Trail will be Puttygut Road, King Road and Meisner Road. Access will be maintained to local traffic within the construction and closure zone, including homes and businesses, during the closure. The project is being financed by the St. Clair County Road Commission at an estimated cost for construction of $55,000.00.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/\" \/>\n<meta property=\"og:site_name\" content=\"Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bluewatertv\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-06-15T14:11:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-06-27T20:14:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png\" \/>\n\t<meta property=\"og:image:width\" content=\"986\" \/>\n\t<meta property=\"og:image:height\" content=\"531\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"john\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Construction on Indian Trail begins June 18th\" \/>\n<meta name=\"twitter:description\" content=\"Maintenance to waterproof the existing bridge on Indian Trail over Belle River is scheduled to begin on Monday, June 18 and end Thursday, June 21st. Work will include shot blasting the concrete surface of the bridge and an epoxy overlay for waterproofing. The posted detour for Indian Trail will be Puttygut Road, King Road, and Meisner Road. Access will be maintained to local traffic within the construction and closure zone, including homes and businesses, during the closure. The project is being financed by the St. Clair County Road Commission at an estimated cost for construction of $55,000.00.\" \/>\n<meta name=\"twitter:image\" content=\"http:\/\/ebw.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png\" \/>\n<meta name=\"twitter:creator\" content=\"@EbwtvNews\" \/>\n<meta name=\"twitter:site\" content=\"@EbwtvNews\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"john\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/\"},\"author\":{\"name\":\"john\",\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/person\/98bcb14b7e0357484c51d1bc200c65c8\"},\"headline\":\"Construction on Indian Trail begins June 18th\",\"datePublished\":\"2018-06-15T14:11:57+00:00\",\"dateModified\":\"2018-06-27T20:14:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/\"},\"wordCount\":106,\"publisher\":{\"@id\":\"https:\/\/thumbcoast.tv\/#organization\"},\"image\":{\"@id\":\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/\",\"url\":\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/\",\"name\":\"Construction on Indian Trail on Belle River begins June 18th\",\"isPartOf\":{\"@id\":\"https:\/\/thumbcoast.tv\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png\",\"datePublished\":\"2018-06-15T14:11:57+00:00\",\"dateModified\":\"2018-06-27T20:14:43+00:00\",\"description\":\"Maintenance to waterproof the existing bridge on Indian Trail over Belle River is scheduled to begin on Monday, June 18 and end Thursday, June 21st.\",\"breadcrumb\":{\"@id\":\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#primaryimage\",\"url\":\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png\",\"contentUrl\":\"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png\",\"width\":986,\"height\":531},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/thumbcoast.tv\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction on Indian Trail begins June 18th\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/thumbcoast.tv\/#website\",\"url\":\"https:\/\/thumbcoast.tv\/\",\"name\":\"ebw.tv - Everything Blue Water Television Network\",\"description\":\"The Blue Water Area&#039;s Positive News Network!\",\"publisher\":{\"@id\":\"https:\/\/thumbcoast.tv\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/thumbcoast.tv\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/thumbcoast.tv\/#organization\",\"name\":\"Blue Water Television Network\",\"url\":\"https:\/\/thumbcoast.tv\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/secureservercdn.net\/198.71.233.36\/999.6a1.myftpupload.com\/wp-content\/uploads\/2017\/04\/cropped-ebw-blue.png?time=1625864790\",\"contentUrl\":\"https:\/\/secureservercdn.net\/198.71.233.36\/999.6a1.myftpupload.com\/wp-content\/uploads\/2017\/04\/cropped-ebw-blue.png?time=1625864790\",\"width\":512,\"height\":512,\"caption\":\"Blue Water Television Network\"},\"image\":{\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bluewatertv\/\",\"https:\/\/x.com\/EbwtvNews\",\"https:\/\/www.instagram.com\/ebw.tv\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/person\/98bcb14b7e0357484c51d1bc200c65c8\",\"name\":\"john\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thumbcoast.tv\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/33c439cc7133aa028fb37d3f5f4530dea276cb6079976fa0aa2d822c6d066430?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/33c439cc7133aa028fb37d3f5f4530dea276cb6079976fa0aa2d822c6d066430?s=96&d=mm&r=g\",\"caption\":\"john\"},\"url\":\"https:\/\/thumbcoast.tv\/author\/john\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction on Indian Trail on Belle River begins June 18th","description":"Maintenance to waterproof the existing bridge on Indian Trail over Belle River is scheduled to begin on Monday, June 18 and end Thursday, June 21st.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/","og_locale":"en_US","og_type":"article","og_title":"Construction on Indian Trail begins June 18th","og_description":"Maintenance to waterproof the existing bridge on Indian Trail over Belle River is scheduled to begin on Monday, June 18 and end Thursday, June 21st. Work will include shot blasting the concrete surface of the bridge and an epoxy overlay for waterproofing. The posted detour for Indian Trail will be Puttygut Road, King Road and Meisner Road. Access will be maintained to local traffic within the construction and closure zone, including homes and businesses, during the closure. The project is being financed by the St. Clair County Road Commission at an estimated cost for construction of $55,000.00.","og_url":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/","og_site_name":"Thumbcoast.tv | ebw.tv - Serving Port Huron and the Thumbcoast","article_publisher":"https:\/\/www.facebook.com\/bluewatertv\/","article_published_time":"2018-06-15T14:11:57+00:00","article_modified_time":"2018-06-27T20:14:43+00:00","og_image":[{"width":986,"height":531,"url":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png","type":"image\/png"}],"author":"john","twitter_card":"summary_large_image","twitter_title":"Construction on Indian Trail begins June 18th","twitter_description":"Maintenance to waterproof the existing bridge on Indian Trail over Belle River is scheduled to begin on Monday, June 18 and end Thursday, June 21st. Work will include shot blasting the concrete surface of the bridge and an epoxy overlay for waterproofing. The posted detour for Indian Trail will be Puttygut Road, King Road, and Meisner Road. Access will be maintained to local traffic within the construction and closure zone, including homes and businesses, during the closure. The project is being financed by the St. Clair County Road Commission at an estimated cost for construction of $55,000.00.","twitter_image":"http:\/\/ebw.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png","twitter_creator":"@EbwtvNews","twitter_site":"@EbwtvNews","twitter_misc":{"Written by":"john"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#article","isPartOf":{"@id":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/"},"author":{"name":"john","@id":"https:\/\/thumbcoast.tv\/#\/schema\/person\/98bcb14b7e0357484c51d1bc200c65c8"},"headline":"Construction on Indian Trail begins June 18th","datePublished":"2018-06-15T14:11:57+00:00","dateModified":"2018-06-27T20:14:43+00:00","mainEntityOfPage":{"@id":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/"},"wordCount":106,"publisher":{"@id":"https:\/\/thumbcoast.tv\/#organization"},"image":{"@id":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#primaryimage"},"thumbnailUrl":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/","url":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/","name":"Construction on Indian Trail on Belle River begins June 18th","isPartOf":{"@id":"https:\/\/thumbcoast.tv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#primaryimage"},"image":{"@id":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#primaryimage"},"thumbnailUrl":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png","datePublished":"2018-06-15T14:11:57+00:00","dateModified":"2018-06-27T20:14:43+00:00","description":"Maintenance to waterproof the existing bridge on Indian Trail over Belle River is scheduled to begin on Monday, June 18 and end Thursday, June 21st.","breadcrumb":{"@id":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#primaryimage","url":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png","contentUrl":"https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png","width":986,"height":531},{"@type":"BreadcrumbList","@id":"https:\/\/thumbcoast.tv\/indian-trail-begins-june-18-2018\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/thumbcoast.tv\/"},{"@type":"ListItem","position":2,"name":"Construction on Indian Trail begins June 18th"}]},{"@type":"WebSite","@id":"https:\/\/thumbcoast.tv\/#website","url":"https:\/\/thumbcoast.tv\/","name":"ebw.tv - Everything Blue Water Television Network","description":"The Blue Water Area&#039;s Positive News Network!","publisher":{"@id":"https:\/\/thumbcoast.tv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/thumbcoast.tv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/thumbcoast.tv\/#organization","name":"Blue Water Television Network","url":"https:\/\/thumbcoast.tv\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thumbcoast.tv\/#\/schema\/logo\/image\/","url":"https:\/\/secureservercdn.net\/198.71.233.36\/999.6a1.myftpupload.com\/wp-content\/uploads\/2017\/04\/cropped-ebw-blue.png?time=1625864790","contentUrl":"https:\/\/secureservercdn.net\/198.71.233.36\/999.6a1.myftpupload.com\/wp-content\/uploads\/2017\/04\/cropped-ebw-blue.png?time=1625864790","width":512,"height":512,"caption":"Blue Water Television Network"},"image":{"@id":"https:\/\/thumbcoast.tv\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bluewatertv\/","https:\/\/x.com\/EbwtvNews","https:\/\/www.instagram.com\/ebw.tv\/"]},{"@type":"Person","@id":"https:\/\/thumbcoast.tv\/#\/schema\/person\/98bcb14b7e0357484c51d1bc200c65c8","name":"john","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thumbcoast.tv\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/33c439cc7133aa028fb37d3f5f4530dea276cb6079976fa0aa2d822c6d066430?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/33c439cc7133aa028fb37d3f5f4530dea276cb6079976fa0aa2d822c6d066430?s=96&d=mm&r=g","caption":"john"},"url":"https:\/\/thumbcoast.tv\/author\/john\/"}]}},"uagb_featured_image_src":{"full":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png",986,531,false],"thumbnail":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-150x150.png",150,150,true],"medium":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-300x162.png",300,162,true],"medium_large":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-768x414.png",768,414,true],"large":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png",986,531,false],"feed_thumbnail":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-150x81.png",150,81,true],"feed_thumbnail@2x":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-300x162.png",300,162,true],"1536x1536":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png",986,531,false],"2048x2048":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png",986,531,false],"et-builder-post-main-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-400x250.png",400,250,true],"et-builder-post-main-image-fullwidth":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png",986,531,false],"et-builder-portfolio-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-400x284.png",400,284,true],"et-builder-portfolio-image-single":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png",986,531,false],"et-builder-gallery-image-portrait":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-400x516.png",400,516,true],"extra-image-huge":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png",986,531,false],"extra-image-single-post":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png",986,531,false],"extra-image-medium":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-627x376.png",627,376,true],"extra-image-small":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-440x264.png",440,264,true],"extra-image-square-medium":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-440x440.png",440,440,true],"extra-image-square-small":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-150x150.png",150,150,true],"et-pb-post-main-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-400x250.png",400,250,true],"et-pb-post-main-image-fullwidth":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png",986,531,false],"et-pb-portfolio-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-400x284.png",400,284,true],"et-pb-portfolio-module-image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-510x382.png",510,382,true],"et-pb-portfolio-image-single":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png",986,531,false],"et-pb-gallery-module-image-portrait":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM-400x516.png",400,516,true],"slider_image":["https:\/\/thumbcoast.tv\/wp-content\/uploads\/2018\/06\/Screen-Shot-2018-06-15-at-9.54.47-AM.png",1,1,false]},"uagb_author_info":{"display_name":"john","author_link":"https:\/\/thumbcoast.tv\/author\/john\/"},"uagb_comment_info":0,"uagb_excerpt":"Sponsored by: Murphy Inn\u00a0 Maintenance to waterproof the existing bridge on Indian Trail over Belle River is scheduled to begin on Monday, June 18 and end Thursday, June 21st.\u00a0 Work will include shot blasting the concrete surface of the bridge and an epoxy overlay for waterproofing. The posted detour for Indian Trail will be Puttygut&hellip;","_links":{"self":[{"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/posts\/10584","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/users\/53"}],"replies":[{"embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/comments?post=10584"}],"version-history":[{"count":1,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/posts\/10584\/revisions"}],"predecessor-version":[{"id":10586,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/posts\/10584\/revisions\/10586"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/media\/10585"}],"wp:attachment":[{"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/media?parent=10584"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/categories?post=10584"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thumbcoast.tv\/api\/wp\/v2\/tags?post=10584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}